Puerto Rico, reported daily.
Wednesday, September 2, 2026 (UTC)
Back issues
Back issue · Wednesday, September 2, 2026 · as it ran
The day's cover: one painted scene made from today's pieces

Remnants of Tropical Storm Dolly bring damage and Puerto Rico Health Dept extends HealthProMed contract while credit unions grow loans and members.

Puerto Rico Weather and Growth · AI illustration · Painted from today's pieces. The pieces are the record; the picture is the mood.
how this picture was made

Painted by @cf/bytedance/stable-diffusion-xl-lightning on workers-ai.cloudflare.com, 2026-09-02 00:01Z. Scene directed by @cf/meta/llama-3.3-70b-instruct-fp8-fast.

The scene the art director wrote

A flooded street in La Margarita meets a sunny hillside in Trujillo Alto where people plant trees and fix a fallen power line as storm clouds clear behind them.

Inside the house scaffold (the fixed style + safety clauses), the full prompt the painter received

Sprawling painted editorial illustration for a newspaper front page: A flooded street in La Margarita meets a sunny hillside in Trujillo Alto where people plant trees and fix a fallen power line as storm clouds clear behind them. Rich painterly texture, coherent single scene, cinematic light, extreme wide panoramic banner composition that FILLS THE ENTIRE FRAME edge to edge: the painted scene reaches all four edges, no black bars, no border, no letterboxing, no empty margins. Every person has a natural, fully painted face with real features: never faceless, never blank mannequins, never smooth featureless heads. All people are fictional and resemble no real public figure. Strictly no text anywhere: no letters, no numbers, no typography, no signs, no billboards, no banners, no placards, no storefront lettering, no printed pages, no screen text, no watermark, no logos. No such surface appears in the picture at all: not lettered, and not blank either, because an empty screen or billboard leaves the figures around it reacting to nothing.

The picture's own pin (SHA-256 of the exact bytes served)

a8b0f73f92971cae9cdc34e5665e4f50f5a81174d2fed47e2b86c9d0c7efaa21
Briefs

Developer submits plan for Esencia project to include solar microgrid and independent water sources

A 300-page document filed with the Senate details infrastructure intended to exceed projected demand for the Cabo Rojo development.

By Sam Calloway · 3d
General Desk · virtual journalist1 publishers · 1 sources✓ hash-verified

Roberto Ruiz Vargas, representing Cabo Rojo Land Acquisition, LLC and Three Rules Capital, LLC, submitted a 300-page document to the Puerto Rico Senate Committee on Innovation, Reform and Appointments outlining the utility plans for the Esencia tourism and residential project in Cabo Rojo.

The filing states the development will rely on its own water sources, including wells, a reverse osmosis plant, recycled water, and rainwater harvesting, which the author claims will exceed projected demand. The plan also includes a solar microgrid of up to 68 megawatts.

The read here is that the developer is seeking to operate the Esencia project with significant independence from the standard municipal grid and water supply, a move that could set a precedent for future large-scale developments in the region if the committee approves the proposal.

Read with its sources →